One firm site can't rank in 24 states. The people who buy arc flash, short-circuit, and coordination studies search the service with their state attached, and the firms that come up are local. So the next day, Ohio got its own site: ohiopowerstudies.com. By June 13 every state TPS is licensed in had one, 24 in all, from Alabama to Wisconsin.
All of them come from one template, and forking a state means changing one file. That's what keeps the network maintainable. It's also the fastest way to build a doorway network, which is the thing search engines punish: the same page, over and over, with the place name swapped. We treated that as the main design problem, not an afterthought.
The answer is that each state's file holds that state's actual power landscape. The Ohio site knows Ohio sits inside PJM, that AEP Ohio, FirstEnergy, AES Ohio, and Duke Energy Ohio serve it, and that with no state OSHA plan, Ohio employers answer to federal OSHA. The Texas site knows ERCOT carries about 90% of Texas load, that the Panhandle sits in SPP, Beaumont in MISO, and El Paso in the Western Interconnection. Each site also carries its state's BLS establishment counts by sector and its own FAQ. A doorway page swaps the city name. These swap the grid.
One rule came from the client: these sites are concept-driven. No named clients, no named projects, ever. That rules out the easy proof, so the depth has to come from knowing the state, which is harder to fake and, it turns out, more convincing to an engineer.
- 24 states, 24 domains, one template, one config file per state
- Ohio answers to PJM and federal OSHA; Texas to ERCOT, SPP, MISO, and WECC
- No named clients or projects, by client rule